Who this checklist is for

I'm the facilities and office purchasing lead at a 200-person company. I manage roughly $150,000 a year in facility and supply spend across about a dozen vendors—everything from janitorial contracts to parking-lot lighting. I took over the purchasing role in 2020, and I've placed enough lighting orders since then to have opinions about all of them.

This checklist is for anyone replacing failing fixtures, retrofitting to LED, or sorting out something specific like light emergency compliance or outdoor security. It's the process I actually use now: seven steps, in the order I do them—which is not the order I did them in for the first two years.

The 7-step checklist

Step 1: Walk the building and count fixtures before you call anyone

I used to start with the vendor call. That was backwards. Get an actual inventory first—room by room, fixture by fixture, with a photo of each type on your phone.

What most people don't realize is that "recessed lighting" covers at least a dozen different products with different trim sizes, color temperatures, and beam spreads. Call a rep and say "we need recessed lights for the second floor" without measurements, and you'll get whatever's on their shelf—not what's actually on your ceiling.

I keep a spreadsheet with three columns: location, fixture type (with a photo), and quantity. That file is the first thing I send any vendor. It's cut my back-and-forth roughly in half over the past year.

Step 2: Decide whether it's a replacement order or an upgrade project

These two things should go through separate approval paths, and mixing them up creates headaches on the finance side.

A replacement order means "the fixture in the south conference room died, order the same model." That's usually an operating expense, and it should happen fast. An upgrade means "we're moving the whole second floor to LED." That's a capital project, and it needs a budget, a plan, and a different conversation with finance.

People think the expensive option is the upgrade. Actually, the expensive option is failing to plan the upgrade and then paying for emergency replacements that get charged to the wrong budget line. I've done that. It's not fun to explain to the Controller.

Step 3: Treat light emergency as a compliance item, not a shopping item

Emergency lighting—exit signs, battery-backup fixtures, egress path lighting—isn't just another category on the lighting order. It's a code requirement with testing obligations attached.

Here's something vendors won't tell you: if you buy emergency lighting from a general lighting rep without asking about testing and documentation, you can end up with fixtures that are technically compliant but difficult to prove compliant during an inspection. Ask specifically for the test records and the code reference. If they can't provide them, walk away.

In my experience, it's better to use a vendor who specializes in life-safety equipment for this category, even if their per-unit price is higher. The paperwork alone is worth the difference.

Step 4: Get the outdoor lighting and security spec right the first time

This is the category where facility buyers and IT usually collide. Outdoor lighting, parking-lot fixtures, and perimeter cameras all touch the same network and power infrastructure, and someone has to own that conversation.

We recently added a wireless smart outdoor camera (GE Lighting's Cync line, in our case) to the loading dock. "Wireless" didn't mean no wiring—it meant no network cable to the camera itself, but it still needed power, a mounting point, and someone to configure it. I wish I'd tracked the installation hours more carefully from the start, but anecdotally, the small "quick" installs have a way of eating a whole afternoon.

Before you order any outdoor fixture, answer three questions: where's the power coming from, what network does it need, and who's installing it—and is that the same person wiring it?

Step 5: Match decorative fixtures (yes, chandeliers) to the actual space

We have a home chandelier in our lobby—the kind you'd normally see in a residential foyer. It was already there when I took the role, and when it failed, the replacement turned into a two-month project because nobody had measured the ceiling height, the mount type, or the width of the freight elevator.

Decorative fixtures are the ones people assume are simple. They're not. Delivery logistics, mounting hardware, and ceiling structure all matter more than the fixture's appearance in a catalog photo. Get the physical dimensions in writing before you order, and walk the delivery path yourself.

Step 6: Answer the electrical scope question before you place the order

This is the step almost everyone skips. Before ordering fixtures, I now sit down with our electrician and answer the scope questions up front. The big one: can you convert a light switch to an outlet? Short answer, yes—an electrician can generally convert a switch box into an outlet box if the circuit and code allow it. But it isn't a lighting order question; it's an electrical scope question, and it needs to be answered before you order fixtures that assume the wiring's already in place.

The related trap is vendors and electricians pointing at each other when something doesn't fit. I now write a one-page scope sheet for every project that lists who supplies what, who installs what, and who's responsible for the wall behind the fixture. It sounds bureaucratic. It's saved me from two awkward phone calls this year.

Step 7: Lock down invoicing, warranty, and returns before you order

This is the step I learned the hard way. In 2021, I found a lighting supplier with strong prices on LED retrofit kits (we've since standardized on GE Lighting's LED Plus line for general replacement, which simplified things). Back then, I ordered 40 units from the cheap supplier. They sent a handwritten receipt instead of an invoice. Finance rejected the expense report, and I had to eat about $1,800 out of my facilities budget while I chased down a proper invoice.

Now I verify three things before I place any order over $1,000: whether they can issue a proper invoice with a PO number, what the warranty period and claims process are, and what the restocking fee is if we order wrong. All three answers go in the order file. None of them are exciting. All of them have saved me.

Common mistakes I still see

  • Ordering before inventory. The single biggest source of wrong orders. Count first.
  • Bundling emergency lighting with general lighting. Different compliance rules, different testing obligations.
  • Trusting "wireless" and "quick install" without a plan. Ask about power, network, and installer.
  • Skipping the electrical scope conversation. Fixtures depend on wiring. Confirm the wiring before you buy.
  • Not verifying invoicing. A cheap price isn't cheap if you can't expense it.

The lighting industry has changed a lot in the five years I've been doing this—LED retrofits that used to be specialty projects are now standard, and smart controls that used to be a luxury add-on are now expected. But the fundamentals haven't moved: count what you have, separate projects from replacements, get the compliance and scope questions answered early, and protect your own expense reports. The execution has transformed. The checklist hasn't.